Sample Lead Time vs Bulk Lead Time

Your first interaction with any apparel manufacturer is a sample. Blank-base garments in our in-stock colors sample in 3 to 5 days. Custom-fabric or decorated samples take 5 to 10 days because they need setup. Once the sample is approved, a confirmed repeat style ships in about 7 days, while a new custom production run takes 10 to 15 days.

Rule of thumb: sampling and bulk happen on the same production lines at a vertically integrated factory, so there is no re-setup cost when you move from sample to bulk.

Typical Timeline by Order Type

Order typeSampleBulk
In-stock blank-base (digital print)3 to 5 days7 days repeat
Custom blank-base (your fabric/color)5 to 10 days10 to 15 days
Screen print / embroidery5 to 10 days10 to 15 days
Full custom knit program10 to 15 days15 to 25 days

These are planning windows, not guarantees. Actual days depend on fabric stock, decoration method and season. We confirm a firm date in the quotation.

What Determines Your Lead Time

  • Fabric availability: in-stock colors are immediate; custom yarn dyeing adds days.
  • Decoration method: digital print is fast; screen print and embroidery need setup.
  • Order quantity: larger runs schedule onto dedicated lines more efficiently.
  • Season: peak months (Aug to Oct) run tighter than the spring lull.
  • Customization depth: branded trims and packaging add a sourcing step.

How to Shorten Your Lead Time

  1. Use in-stock blank-base colors and digital print for the fastest path.
  2. Send a complete tech pack so we do not wait on missing specs.
  3. Approve the sample by photo proof when a physical send is slow.
  4. Pre-book capacity if you have a fixed launch date.
For launches with a hard deadline, tell us the date in the inquiry. We will reverse-plan the sample and bulk windows so you land on time.

Common Lead Time Questions

  • Can I get bulk in under 7 days? Only for confirmed repeats of an in-stock blank-base style.
  • Why does custom fabric take longer? Yarn must be sourced or dyed to your spec before cutting.
  • Does a larger order take longer? Not linearly — bigger runs use dedicated lines more efficiently.